27,000h-e design capacity (2022) · 604th of 4,051 (tied with 11 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR060983035001 · reported size 27,000 h-e design capacity · received load 18,968 h-e · reported treatment: PST · data year 2022. 604th of 4,051 records with reported size in the inventory of France (tied with 11 others); 0.03 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.6 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 43.1673, 5.7732 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: France
Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 18,968 p.e. of reported load; equivalent average load 18,975 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (2,750 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| La Cride | 5.6 km | 60,000 | 45,698 | primary and secondary |
| Saint-Cyr-Sur-Mer Pointe Grenier | 7.0 km | 35,000 | 17,192 | primary and secondary |
| Cuges-les-Pins | 12.6 km | 3,000 | 3,524 | primary and secondary |
| La Ciotat | 13.9 km | 94,835 | 71,483 | primary and secondary |
| Cap Sicié - Amphitria | 14.6 km | 500,000 | 305,512 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP LE CASTELLET-LE BEAUSSET-LA CADIÈRE report?
Reported size: 27,000 h-e design capacity. Received load: 18,968 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of LE CASTELLET-LE BEAUSSET-LA CADIÈRE?
Aguas SB simulator reference scenario for 18,968 p.e. of reported load: 749,856 kWh per year (39.5 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.