Worldwide wastewater treatment observatory · Hungary

Aguas SB Observatory · public data to understand water

WWTP Jaszszentlaszlo - Szennyviztisztito Telep

Hungary · official identifier HU-WWTP-AIA748

2,585h-e design capacity (2022) · 520th of 829

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AIA748 · reported size 2,585 h-e design capacity · received load 4,235 h-e · reported treatment: PST · data year 2022. 520th of 829 records with reported size in the inventory of Hungary; 0.02 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.7 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

2,585h-e design capacity
4,235h-e received load (2022)
164 %reported load/capacity ratio (not hydraulic utilisation)
520th of 829by reported size among the 829 records with a size in the inventory · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates46.5699, 19.7721 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Regulatory reference: Hungary

Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

162,892reference kWh per year for this load
43.4kWh per h-e (average load) per year
24,434€ per year at 0.15 €/kWh
76 %share of energy used for aeration

what this estimate is · Inputs: 4,235 p.e. of reported load; equivalent average load 3,756 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (415 m³/day of reference), not measured or available for reclamation.

LOCATION

Hungary: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Kiskunmajsa - Szennyviztisztito Telep8.7 km9,0008,141primary, secondary and tertiary
Bugac - Szennyviztisztito Telep13.6 km3,5501,570primary, secondary and tertiary
Kiskunfelegyhaza - Szennyviztisztito Telep17.4 km49,16655,308primary and secondary
Kistelek - Szennyviztisztito Telep19.9 km8,4705,786primary, secondary and tertiary
Zsana - Szennyviztisztito Telep23.1 km1,200277primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Jaszszentlaszlo - Szennyviztisztito Telep report?

Reported size: 2,585 h-e design capacity. Received load: 4,235 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Jaszszentlaszlo - Szennyviztisztito Telep?

Aguas SB simulator reference scenario for 4,235 p.e. of reported load: 162,892 kWh per year (43.4 kWh per p.e. of average load), with aeration as 76 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.