Worldwide wastewater treatment observatory · Hungary
Aguas SB Observatory · public data to understand water
WWTP Kiskunfelegyhaza - Szennyviztisztito Telep
Hungary · official identifier HU-WWTP-AHZ528
49,166h-e design capacity (2022) · 54th of 829
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AHZ528 · reported size 49,166 h-e design capacity · received load 55,308 h-e · reported treatment: PS · data year 2022. 54th of 829 records with reported size in the inventory of Hungary; 0.33 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 12.3 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 46.7107, 19.8712 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Hungary
Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 55,308 p.e. of reported load; equivalent average load 49,051 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (5,420 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Bugac - Szennyviztisztito Telep | 12.3 km | 3,550 | 1,570 | primary, secondary and tertiary |
| Tiszaalpar - Szennyviztisztito Telep | 13.6 km | 5,500 | 3,599 | primary, secondary and tertiary |
| Nyarlorinc - Szennyviztisztito Telep | 16.0 km | 2,200 | 1,824 | primary, secondary and tertiary |
| Jaszszentlaszlo - Szennyviztisztito Telep | 17.4 km | 2,585 | 4,235 | primary, secondary and tertiary |
| Jakabszallas - Szennyviztisztito Telep | 19.9 km | 2,199 | 2,200 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Kiskunfelegyhaza - Szennyviztisztito Telep report?
Reported size: 49,166 h-e design capacity. Received load: 55,308 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Kiskunfelegyhaza - Szennyviztisztito Telep?
Aguas SB simulator reference scenario for 55,308 p.e. of reported load: 1,659,073 kWh per year (33.8 kWh per p.e. of average load), with aeration as 63 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.