Worldwide wastewater treatment observatory · Hungary
Aguas SB Observatory · public data to understand water
WWTP Zalaegerszeg - Szennyviztisztito Telep
Hungary · official identifier HU-WWTP-AIC153
180,000h-e design capacity (2022) · 12th of 829 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HU-WWTP-AIC153 · reported size 180,000 h-e design capacity · received load 93,758 h-e · reported treatment: PST · data year 2022. 12th of 829 records with reported size in the inventory of Hungary (tied with 1 others); 1.2 % of the sum of those 829 records in h-e (sum of records, not national capacity); nearest inventoried plant at 11.6 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 46.8534, 16.8576 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 1985 · The Zalaegerszeg plant opened in 1985, according to the municipal account of its upgrade. Municipality of Zalaegerszeg
Other published data
| Mean annual volume treated reported in the 2022 cycle | 4,412,770 m³/year (2022) · source |
|---|
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L04; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Hungary
Regulatory framework of Hungary · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 93,758 p.e. of reported load; equivalent average load 83,151 p.e. with the reference profile of Hungary (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (9,188 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Gellenhaza - Szennyviztisztito Telep | 11.6 km | 2,200 | 2,573 | primary and secondary |
| Gersekarat - Szennyviztisztito Telep | 14.0 km | 1,000 | 638 | primary and secondary |
| Becsvolgye - Szennyviztisztito Telep | 15.7 km | 832 | 512 | primary and secondary |
| Hegyhathodasz Szennyviztisztito Telep | 17.4 km | 180 | 114 | primary, secondary and tertiary |
| Pacsa - Szennyviztisztito Telep | 17.9 km | 9,484 | 8,697 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Zalaegerszeg - Szennyviztisztito Telep report?
Reported size: 180,000 h-e design capacity. Received load: 93,758 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Zalaegerszeg - Szennyviztisztito Telep?
Aguas SB simulator reference scenario for 93,758 p.e. of reported load: 2,531,974 kWh per year (30.5 kWh per p.e. of average load), with aeration as 63 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.