Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP Bianco - Crocifisso Centro

Italy · official identifier IT18Q90000003067

250h-e design capacity (2022) · 3563rd of 3,726 (tied with 22 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT18Q90000003067 · reported size 250 h-e design capacity · received load 250 h-e · reported treatment: PST · data year 2022. 3563rd of 3,726 records with reported size in the inventory of Italy (tied with 22 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.5 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

250h-e design capacity
250h-e received load (2022)
100 %reported load/capacity ratio (not hydraulic utilisation)
3563rd of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 22 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates38.0951, 16.0999 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band under 1,000 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

17,330reference kWh per year for this load
100.5kWh per h-e (average load) per year
2,600€ per year at 0.15 €/kWh
44 %share of energy used for aeration

what this estimate is · Inputs: 250 p.e. of reported load; equivalent average load 173 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (50 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Bianco - Consortile Bianco - Benestare - Bovalino Parte Di C3.5 km40,00019,840primary, secondary and tertiary
Oppido Mamertina - Rete44.7 kmnot reportednot reportednot reported
Ferruzzano - Centro5.9 kmnot reported400not reported
Africo - Artusa6.2 km2,0003,204primary, secondary and tertiary
Ferruzzano - Saccuti6.8 kmnot reported400not reported

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Bianco - Crocifisso Centro report?

Reported size: 250 h-e design capacity. Received load: 250 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Bianco - Crocifisso Centro?

Aguas SB simulator reference scenario for 250 p.e. of reported load: 17,330 kWh per year (100.5 kWh per p.e. of average load), with aeration as 44 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.