Italy · official identifier IT18Q90000003092

7,000h-e design capacity (2022) · 1638th of 3,726 (tied with 76 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT18Q90000003092 · reported size 7,000 h-e design capacity · received load 6,736 h-e · reported treatment: PST · data year 2022. 1638th of 3,726 records with reported size in the inventory of Italy (tied with 76 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.9 km · 18 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

7,000h-e design capacity
6,736h-e received load (2022)
96 %reported load/capacity ratio (not hydraulic utilisation)
1638th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 76 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates38.4551, 16.5594 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

232,955reference kWh per year for this load
50.1kWh per h-e (average load) per year
34,943€ per year at 0.15 €/kWh
68 %share of energy used for aeration

what this estimate is · Inputs: 6,736 p.e. of reported load; equivalent average load 4,647 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.5estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,347 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Monasterace - Campo Marzo1.9 km500500primary, secondary and tertiary
Stilo - Gatticella2.8 km4040primary, secondary and tertiary
Monasterace - Lambrosi Marina3.1 km3,0003,000primary, secondary and tertiary
Roccella Jonica - Loc. Canne3.2 km50,00027,900primary, secondary and tertiary
Stilo - Marone3.4 km5050primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Gioiosa Ionica - Miccio report?

Reported size: 7,000 h-e design capacity. Received load: 6,736 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Gioiosa Ionica - Miccio?

Aguas SB simulator reference scenario for 6,736 p.e. of reported load: 232,955 kWh per year (50.1 kWh per p.e. of average load), with aeration as 68 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.