Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP Monasterace - Campo Marzo
Italy · official identifier IT18Q90000003118
500h-e design capacity (2022) · 3409th of 3,726 (tied with 69 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT18Q90000003118 · reported size 500 h-e design capacity · received load 500 h-e · reported treatment: PST · data year 2022. 3409th of 3,726 records with reported size in the inventory of Italy (tied with 69 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.9 km · 18 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 38.4690, 16.5724 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band under 1,000 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 500 p.e. of reported load; equivalent average load 345 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (100 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Gioiosa Ionica - Miccio | 1.9 km | 7,000 | 6,736 | primary, secondary and tertiary |
| Guardavalle - Mare | 2.7 km | 10,000 | 4,375 | primary, secondary and tertiary |
| Santa Caterina Dello Jonio - Capuccini | 3.8 km | 1,000 | 1,335 | primary, secondary and tertiary |
| Monasterace - Lambrosi Marina | 4.6 km | 3,000 | 3,000 | primary, secondary and tertiary |
| Roccella Jonica - Loc. Canne | 4.6 km | 50,000 | 27,900 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Monasterace - Campo Marzo report?
Reported size: 500 h-e design capacity. Received load: 500 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Monasterace - Campo Marzo?
Aguas SB simulator reference scenario for 500 p.e. of reported load: 24,819 kWh per year (71.9 kWh per p.e. of average load), with aeration as 51 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.