Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP IDI_CASA_DEL_LUPO

Italy · official identifier IT09RT0690

400,000h-e design capacity (2022) · 41st of 3,726 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT09RT0690 · reported size 400,000 h-e design capacity · received load 185,603 h-e · reported treatment: PST · data year 2022. 41st of 3,726 records with reported size in the inventory of Italy (tied with 1 others); 0.38 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.2 km · 8 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

400,000h-e design capacity
185,603h-e received load (2022)
46 %reported load/capacity ratio (not hydraulic utilisation)
41st of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 1 others) · 0.38 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates43.8210, 10.5997 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2026-11 · In November 2026 Capannori’s council approved a motion to promote further investment in technology at the Casa del Lupo wastewater treatment plant. Municipality of Capannori

Other published data

Mean annual volume treated reported in the 2022 cycle10,327,233 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L04; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

4,718,920reference kWh per year for this load
36.8kWh per h-e (average load) per year
707,838€ per year at 0.15 €/kWh
50 %share of energy used for aeration

what this estimate is · Inputs: 185,603 p.e. of reported load; equivalent average load 128,067 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

13.5estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (37,121 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Idl_badia_pozzeveri4.2 km1,5001,352primary, secondary and tertiary
Idl_colle_di_compito4.4 km4,8001,992primary, secondary and tertiary
Idl_altopascio_capoluogo5.2 km6,7005,307primary, secondary and tertiary
Idi_pontetetto8.0 km95,00073,481primary, secondary and tertiary
Idl_macchie_san_piero_tomolo8.6 km1,250293primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP IDI_CASA_DEL_LUPO report?

Reported size: 400,000 h-e design capacity. Received load: 185,603 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of IDI_CASA_DEL_LUPO?

Aguas SB simulator reference scenario for 185,603 p.e. of reported load: 4,718,920 kWh per year (36.8 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.