Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP IDI_PONTETETTO
Italy · official identifier IT09RT0645
95,000h-e design capacity (2022) · 192nd of 3,726 (tied with 3 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT09RT0645 · reported size 95,000 h-e design capacity · received load 73,481 h-e · reported treatment: PST · data year 2022. 192nd of 3,726 records with reported size in the inventory of Italy (tied with 3 others); 0.09 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.0 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 43.8208, 10.5004 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 73,481 p.e. of reported load; equivalent average load 50,701 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (14,696 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Idi_casa_del_lupo | 8.0 km | 400,000 | 185,603 | primary, secondary and tertiary |
| Idl_colle_di_compito | 9.6 km | 4,800 | 1,992 | primary, secondary and tertiary |
| Idl_vecchiano | 10.0 km | 9,000 | 6,317 | primary, secondary and tertiary |
| Idl_baragaglia | 11.9 km | 5,000 | 4,848 | primary, secondary and tertiary |
| Idl_badia_pozzeveri | 12.2 km | 1,500 | 1,352 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP IDI_PONTETETTO report?
Reported size: 95,000 h-e design capacity. Received load: 73,481 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of IDI_PONTETETTO?
Aguas SB simulator reference scenario for 73,481 p.e. of reported load: 2,256,893 kWh per year (44.5 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.