Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP IMPIANTO VILLAGGIO MOSE'
Italy · official identifier IT19AG00G0023DE002
1,500h-e design capacity (2022) · 3040th of 3,726 (tied with 83 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT19AG00G0023DE002 · reported size 1,500 h-e design capacity · received load 7,000 h-e · reported treatment: PS · data year 2022. 3040th of 3,726 records with reported size in the inventory of Italy (tied with 83 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.7 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 37.2658, 13.6304 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 7,000 p.e. of reported load; equivalent average load 4,830 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,400 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Impianto C.Da Burgialamone-Chimento | 3.7 km | 35,000 | 35,000 | primary and secondary |
| Impianto C.Da S.Anna | 6.1 km | 55,000 | 49,970 | primary and secondary |
| Sistema Di Collettamento Agrigento | 6.9 km | not reported | not reported | not reported |
| Impianto C.Da Fontanelle | 8.3 km | 11,000 | 9,614 | primary and secondary |
| Impianto Via Molo Levante | 9.0 km | 33,000 | 28,841 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP IMPIANTO VILLAGGIO MOSE' report?
Reported size: 1,500 h-e design capacity. Received load: 7,000 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of IMPIANTO VILLAGGIO MOSE'?
Aguas SB simulator reference scenario for 7,000 p.e. of reported load: 241,527 kWh per year (50.0 kWh per p.e. of average load), with aeration as 69 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.