Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP San Calogero – Calimera
Italy · official identifier IT18Q90000003049
600h-e design capacity (2022) · 3377th of 3,726 (tied with 25 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT18Q90000003049 · reported size 600 h-e design capacity · received load 1,331 h-e · data year 2022. 3377th of 3,726 records with reported size in the inventory of Italy (tied with 25 others); < 0.01 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.9 km · 14 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | not reported |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 38.5492, 16.0175 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band under 1,000 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,331 p.e. of reported load; equivalent average load 918 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (266 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| San Calogero – Coccumella | 1.9 km | 30,000 | 6,775 | not reported |
| Limbadi - Rete Loc.Cardillo | 2.1 km | not reported | not reported | not reported |
| Limbadi - Macrea | 3.4 km | 6,000 | 2,800 | primary, secondary and tertiary |
| Limbadi - Rete Loc. Cicria | 4.1 km | not reported | not reported | not reported |
| San Calogero - Mileto Comparni | 4.1 km | not reported | 653 | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP San Calogero – Calimera report?
Reported size: 600 h-e design capacity. Received load: 1,331 h-e. Units are retained without conversion.
What treatment is reported?
Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of San Calogero – Calimera?
Aguas SB simulator reference scenario for 1,331 p.e. of reported load: 53,008 kWh per year (57.8 kWh per p.e. of average load), with aeration as 59 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.