Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP San Calogero - Mileto Comparni

Italy · official identifier IT18Q19000000003

not reportedh-e design capacity (2022)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT18Q19000000003 · reported size not reported h-e design capacity · received load 653 h-e · data year 2022. nearest inventoried plant at 2.3 km · 19 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

not reportedh-e design capacity
653h-e received load (2022)
not reportedsin tamaño declarado · the largest plants in the country
Treatmentnot reported
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates38.5690, 16.0579 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

30,727reference kWh per year for this load
68.0kWh per h-e (average load) per year
4,609€ per year at 0.15 €/kWh
51 %share of energy used for aeration

what this estimate is · Inputs: 653 p.e. of reported load; equivalent average load 452 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (131 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
San Calogero – Coccumella2.3 km30,0006,775not reported
San Calogero - Mileto San Giovanni2.9 kmnot reported11,372not reported
San Calogero – Calimera4.1 km6001,331not reported
Rombiolo - Chiusa5.0 km2,5003,786primary, secondary and tertiary
San Calogero - Filandari Scaliti5.2 kmnot reported460not reported

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP San Calogero - Mileto Comparni report?

Reported size: not reported h-e design capacity. Received load: 653 h-e. Units are retained without conversion.

What treatment is reported?

Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of San Calogero - Mileto Comparni?

Aguas SB simulator reference scenario for 653 p.e. of reported load: 30,727 kWh per year (68.0 kWh per p.e. of average load), with aeration as 51 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.