Worldwide wastewater treatment observatory · Italy
Aguas SB Observatory · public data to understand water
WWTP SAN_GIORGIO_DI_NOGARO_Z.I._AUSSA_CORNO
Italy · official identifier IT06000000000098
698,000h-e design capacity (2022) · 19th of 3,726
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT06000000000098 · reported size 698,000 h-e design capacity · received load 105,183 h-e · reported treatment: PST · data year 2022. 19th of 3,726 records with reported size in the inventory of Italy; 0.67 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 12.9 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 45.7602, 13.2320 precision reported by the source: level 1 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2025-11-06 · A project to install a low-temperature sludge dryer at the Aussa Corno treatment plant was presented in San Giorgio di Nogaro. La Vita Cattolica
Other published data
| Mean annual volume treated reported in the 2022 cycle | 10,519,306 m³/year (2022) · source |
|---|
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Italy
Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 105,183 p.e. of reported load; equivalent average load 72,578 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (21,037 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Lignano_sabbiadoro_loc_lovato | 12.9 km | 86,400 | 82,538 | primary, secondary and tertiary |
| Fiumicello_loc_san_lorenzo | 13.5 km | 6,000 | 4,151 | primary, secondary and tertiary |
| Gonars_via_molini | 14.8 km | 6,000 | 4,166 | primary and secondary |
| Latisana_loc_paludo | 15.5 km | 14,000 | 9,066 | primary, secondary and tertiary |
| Castions_di_strada_via_latisana | 16.0 km | 5,000 | 2,213 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP SAN_GIORGIO_DI_NOGARO_Z.I._AUSSA_CORNO report?
Reported size: 698,000 h-e design capacity. Received load: 105,183 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of SAN_GIORGIO_DI_NOGARO_Z.I._AUSSA_CORNO?
Aguas SB simulator reference scenario for 105,183 p.e. of reported load: 3,005,175 kWh per year (41.4 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.