449h-e design capacity (2022) · 273rd of 340
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4602.0047.01 · reported size 449 h-e design capacity · received load 432 h-e · reported treatment: P · data year 2022. 273rd of 340 records with reported size in the inventory of Norway; < 0.01 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.6 km · 19 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primario (as reported to the EEA: P) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 61.5854, 5.0000 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 432 p.e. of reported load; equivalent average load 335 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (86 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Havreneset Sør (Rd 6) | 0.9 km | 979 | 758 | primary |
| Breivika | 1.2 km | 680 | 634 | primary |
| Nordnes | 1.7 km | 191 | 191 | primary |
| Storåsen Sør (Rd 9) | 1.7 km | 1,950 | 870 | primary |
| Kvalvågen (Rd 4) | 1.8 km | 730 | 546 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Gunnhildvågen (RD 8) report?
Reported size: 449 h-e design capacity. Received load: 432 h-e. Units are retained without conversion.
What treatment is reported?
Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Gunnhildvågen (RD 8)?
Aguas SB simulator reference scenario for 432 p.e. of reported load: 23,616 kWh per year (70.4 kWh per p.e. of average load), with aeration as 53 % of consumption. Estimate with the country reference profile; not a measurement of the plant.