Worldwide wastewater treatment observatory · Norway
Aguas SB Observatory · public data to understand water
WWTP Storåsen Sør (RD 9)
Norway · official identifier NO4602.0024.01
1,950h-e design capacity (2022) · 233rd of 340 (tied with 2 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4602.0024.01 · reported size 1,950 h-e design capacity · received load 870 h-e · reported treatment: P · data year 2022. 233rd of 340 records with reported size in the inventory of Norway (tied with 2 others); 0.03 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.6 km · 19 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primario (as reported to the EEA: P) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 61.5856, 5.0329 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 870 p.e. of reported load; equivalent average load 679 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (174 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Flo26 Brendøyvn/Kystmuseet | 0.6 km | 800 | 455 | primary |
| Kanalen Sør (Rd10) | 1.4 km | 10,000 | 3,064 | primary |
| Breivika | 1.7 km | 680 | 634 | primary |
| Gunnhildvågen (Rd 8) | 1.7 km | 449 | 432 | primary |
| Sentrum | 1.8 km | 100 | 70 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Storåsen Sør (RD 9) report?
Reported size: 1,950 h-e design capacity. Received load: 870 h-e. Units are retained without conversion.
What treatment is reported?
Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Storåsen Sør (RD 9)?
Aguas SB simulator reference scenario for 870 p.e. of reported load: 41,061 kWh per year (60.5 kWh per p.e. of average load), with aeration as 57 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.