Worldwide wastewater treatment observatory · Norway
Aguas SB Observatory · public data to understand water
WWTP Huseby renseanlegg
Norway · official identifier NO4206.0050.01
16,400h-e design capacity (2022) · 78th of 340 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4206.0050.01 · reported size 16,400 h-e design capacity · received load 8,604 h-e · reported treatment: P · data year 2022. 78th of 340 records with reported size in the inventory of Norway (tied with 1 others); 0.22 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 40.9 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primario (as reported to the EEA: P) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 58.0729, 6.7762 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 8,604 p.e. of reported load; equivalent average load 6,712 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,721 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Grønvika Renseanlegg - Mandal | 40.9 km | 21,000 | 14,533 | primary, secondary and tertiary |
| Hestnes Renseanlegg | 59.3 km | 50,000 | 44,572 | primary |
| Høllen Renseanlegg | 60.5 km | 16,000 | 16,823 | primary, secondary and tertiary |
| Bredalsholmen Renseanlegg | 71.6 km | 35,000 | 78,167 | primary, secondary and tertiary |
| Odderøya Renseanlegg | 72.2 km | 200,000 | 87,234 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Huseby renseanlegg report?
Reported size: 16,400 h-e design capacity. Received load: 8,604 h-e. Units are retained without conversion.
What treatment is reported?
Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Huseby renseanlegg?
Aguas SB simulator reference scenario for 8,604 p.e. of reported load: 338,206 kWh per year (50.4 kWh per p.e. of average load), with aeration as 44 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.