WWTP Moelv renseanlegg
Norway · official identifier NO3411.0086.01
28,500h-e design capacity (2022) · 49th of 340
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO3411.0086.01 · reported size 28,500 h-e design capacity · received load 8,160 h-e · reported treatment: PST · data year 2022. 49th of 340 records with reported size in the inventory of Norway; 0.38 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 16.1 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 60.9214, 10.6926 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 8,160 p.e. of reported load; equivalent average load 6,365 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,632 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Rambekk Renseanlegg | 16.1 km | 45,000 | 43,174 | primary, secondary and tertiary |
| Breiskallen Renseanlegg | 19.5 km | 14,500 | 17,034 | primary, secondary and tertiary |
| Nes Renseanlegg | 22.1 km | 5,000 | 2,277 | primary, secondary and tertiary |
| Lillehammer Renseanlegg | 22.9 km | 144,000 | 71,810 | primary, secondary and tertiary |
| Kapp Renseanlegg | 24.5 km | 6,200 | 2,919 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Moelv renseanlegg report?
Reported size: 28,500 h-e design capacity. Received load: 8,160 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Moelv renseanlegg?
Aguas SB simulator reference scenario for 8,160 p.e. of reported load: 321,730 kWh per year (50.5 kWh per p.e. of average load), with aeration as 44 % of consumption. Estimate with the country reference profile; not a measurement of the plant.