Worldwide wastewater treatment observatory · Norway
Aguas SB Observatory · public data to understand water
WWTP Sæverhagen
Norway · official identifier NO4614.0066.01
1,618h-e design capacity (2022) · 239th of 340
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4614.0066.01 · reported size 1,618 h-e design capacity · received load 1,618 h-e · data year 2022. 239th of 340 records with reported size in the inventory of Norway; 0.02 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.2 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | not reported |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 59.8010, 5.5320 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,618 p.e. of reported load; equivalent average load 1,264 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (324 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Økland, Knosterneset | 1.2 km | 1,450 | 1,060 | not reported |
| Djupavik | 2.8 km | 4,200 | 3,522 | primary |
| Bjelland, Utslipp 5.01 -5.03 | 3.6 km | 2,250 | 1,126 | not reported |
| Aker Stord Ii, Kjøtteinståa | 4.3 km | 1,000 | 700 | primary and secondary |
| Aker Stord I, Eldøyane | 5.5 km | 1,000 | 950 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Sæverhagen report?
Reported size: 1,618 h-e design capacity. Received load: 1,618 h-e. Units are retained without conversion.
What treatment is reported?
Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Sæverhagen?
Aguas SB simulator reference scenario for 1,618 p.e. of reported load: 68,843 kWh per year (54.5 kWh per p.e. of average load), with aeration as 64 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.