Worldwide wastewater treatment observatory · Norway
Aguas SB Observatory · public data to understand water
WWTP Solstrandsfjæra
Norway · official identifier NO4624.0066.01
300h-e design capacity (2022) · 280th of 340 (tied with 9 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier NO4624.0066.01 · reported size 300 h-e design capacity · received load 170 h-e · reported treatment: P · data year 2022. 280th of 340 records with reported size in the inventory of Norway (tied with 9 others); < 0.01 % of the sum of those 340 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.3 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primario (as reported to the EEA: P) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 60.1876, 5.4847 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Norway
Regulatory framework of Norway. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 170 p.e. of reported load; equivalent average load 133 p.e. with the reference profile of Norway (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (34 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Solstrand Fjordhotell | 0.3 km | 914 | 156 | primary |
| Ohara Renseanlegg | 1.9 km | 50,000 | 15,200 | primary |
| Flesland Renseanlegg | 18.6 km | 152,000 | 234,490 | primary and secondary |
| Knappen Renseanlegg | 20.3 km | 63,000 | 74,149 | primary, secondary and tertiary |
| Skareveien | 21.9 km | 125 | 168 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Solstrandsfjæra report?
Reported size: 300 h-e design capacity. Received load: 170 h-e. Units are retained without conversion.
What treatment is reported?
Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Solstrandsfjæra?
Aguas SB simulator reference scenario for 170 p.e. of reported load: 14,722 kWh per year (111.0 kWh per p.e. of average load), with aeration as 41 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.