Worldwide wastewater treatment observatory · Poland
Aguas SB Observatory · public data to understand water
WWTP Bażanowice
Poland · official identifier PLSL6032
6,500h-e design capacity (2022) · 977th of 1,654 (tied with 8 others)
Facility inactive according to reported data. Historical profile: excluded from current aggregates.
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLSL6032 · reported size 6,500 h-e design capacity · reported treatment: PS · data year 2022. 977th of 1,654 records with reported size in the inventory of Poland (tied with 8 others); 0.01 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.8 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | inactive according to reported data |
| Reported coordinates | 49.7364, 18.7114 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Poland
Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cisownica | 3.8 km | 1,800 | 1,560 | primary and secondary |
| Ustroń | 7.0 km | 48,151 | 15,933 | primary, secondary and tertiary |
| Oczyszczalnia Ścieków W Cieszynie | 8.3 km | 99,999 | 36,699 | primary, secondary and tertiary |
| Miejska Oczyszczalnia Ścieków Skoczów | 10.4 km | 66,000 | 37,055 | primary, secondary and tertiary |
| Oczyszczalnia Pogwizdów | 11.8 km | 7,375 | 4,500 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Bażanowice report?
Reported size: 6,500 h-e design capacity. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.