WWTP Oczyszczalnia Ścieków w Goleniowie
Poland · official identifier PLZA0120
63,000h-e design capacity (2022) · 175th of 1,654
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PLZA0120 · reported size 63,000 h-e design capacity · received load 39,310 h-e · reported treatment: PST · data year 2022. 175th of 1,654 records with reported size in the inventory of Poland; 0.12 % of the sum of those 1,654 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.2 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 53.5658, 14.8106 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Poland
Regulatory framework of Poland · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 39,310 p.e. of reported load; equivalent average load 30,635 p.e. with the reference profile of Poland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (4,245 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Oczyszczalnia Ścieków W Komarowie | 5.2 km | 7,795 | 5,973 | primary and secondary |
| Stepnica | 15.6 km | 8,843 | 4,823 | primary and secondary |
| Police Zakład | 16.7 km | 216,000 | 41,030 | primary, secondary and tertiary |
| Oczyszczalnia Ścieków Maszewo | 18.0 km | 7,500 | 4,629 | primary and secondary |
| Zdroje | 23.9 km | 177,000 | 89,377 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Oczyszczalnia Ścieków w Goleniowie report?
Reported size: 63,000 h-e design capacity. Received load: 39,310 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Oczyszczalnia Ścieków w Goleniowie?
Aguas SB simulator reference scenario for 39,310 p.e. of reported load: 1,202,269 kWh per year (39.2 kWh per p.e. of average load), with aeration as 60 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.