Worldwide wastewater treatment observatory · Portugal
Aguas SB Observatory · public data to understand water
WWTP Barreiro/Moita
Portugal · official identifier PTAGL016tp01
294,650h-e design capacity (2022) · 10th of 527
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PTAGL016tp01 · reported size 294,650 h-e design capacity · received load 170,000 h-e · reported treatment: PST · data year 2022. 10th of 527 records with reported size in the inventory of Portugal; 1.7 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.0 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 38.6758, -9.0457 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2011 · The Barreiro and Moita wastewater treatment plant entered service. Municipality of Moita
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Portugal
Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 170,000 p.e. of reported load; equivalent average load 170,000 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (34,000 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Seixalinho | 5.0 km | 48,000 | 42,350 | primary, secondary and tertiary |
| Seixal | 5.4 km | 155,570 | 113,500 | primary, secondary and tertiary |
| Afonsoeiro | 7.6 km | 47,940 | 47,900 | primary, secondary and tertiary |
| Cucena | 7.9 km | 30,600 | 8,300 | primary, secondary and tertiary |
| Quinta da Bomba | 8.9 km | 198,290 | 142,900 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Barreiro/Moita report?
Reported size: 294,650 h-e design capacity. Received load: 170,000 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Barreiro/Moita?
Aguas SB simulator reference scenario for 170,000 p.e. of reported load: 5,255,706 kWh per year (30.9 kWh per p.e. of average load), with aeration as 59 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.