Worldwide wastewater treatment observatory · Portugal

Aguas SB Observatory · public data to understand water

WWTP Machico

Portugal · official identifier PT21506918

16,500h-e design capacity (2022) · 160th of 527 (tied with 2 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PT21506918 · reported size 16,500 h-e design capacity · received load 9,500 h-e · reported treatment: P · data year 2022. 160th of 527 records with reported size in the inventory of Portugal (tied with 2 others); 0.10 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.8 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

16,500h-e design capacity
9,500h-e received load (2022)
58 %reported load/capacity ratio (not hydraulic utilisation)
160th of 527by reported size among the 527 records with a size in the inventory (tied with 2 others) · 0.10 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimario (as reported to the EEA: P) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates32.7187, -16.7590 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Portugal

Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

421,611reference kWh per year for this load
44.4kWh per h-e (average load) per year
63,242€ per year at 0.15 €/kWh
49 %share of energy used for aeration

what this estimate is · Inputs: 9,500 p.e. of reported load; equivalent average load 9,500 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.7estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (1,900 m³/day of reference), not measured or available for reclamation.

LOCATION

Portugal: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Canical3.8 km8,2676,300primary
Santa Cruz4.3 km13,6155,500primary
Canico10.8 km27,00027,000primary
Funchal18.3 km140,000100,000primary
Camara de Lobos21.8 km46,00025,000primary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Machico report?

Reported size: 16,500 h-e design capacity. Received load: 9,500 h-e. Units are retained without conversion.

What treatment is reported?

Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Machico?

Aguas SB simulator reference scenario for 9,500 p.e. of reported load: 421,611 kWh per year (44.4 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.