WWTP Santa Cruz
Portugal · official identifier PTAGL497tp01
13,615h-e design capacity (2022) · 181st of 527
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier PTAGL497tp01 · reported size 13,615 h-e design capacity · received load 5,500 h-e · reported treatment: P · data year 2022. 181st of 527 records with reported size in the inventory of Portugal; 0.08 % of the sum of those 527 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.3 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primario (as reported to the EEA: P) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 32.6884, -16.7867 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Portugal
Regulatory framework of Portugal · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 5,500 p.e. of reported load; equivalent average load 5,500 p.e. with the reference profile of Portugal (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,100 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Machico | 4.3 km | 16,500 | 9,500 | primary |
| Canico | 6.5 km | 27,000 | 27,000 | primary |
| Canical | 8.0 km | 8,267 | 6,300 | primary |
| Funchal | 14.5 km | 140,000 | 100,000 | primary |
| Camara de Lobos | 18.3 km | 46,000 | 25,000 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Santa Cruz report?
Reported size: 13,615 h-e design capacity. Received load: 5,500 h-e. Units are retained without conversion.
What treatment is reported?
Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Santa Cruz?
Aguas SB simulator reference scenario for 5,500 p.e. of reported load: 251,565 kWh per year (45.7 kWh per p.e. of average load), with aeration as 47 % of consumption. Estimate with the country reference profile; not a measurement of the plant.