Worldwide wastewater treatment observatory · Romania
Aguas SB Observatory · public data to understand water
WWTP ROWP Cata
Romania · official identifier ROWP_40777_01
2,800h-e design capacity (2022) · 984th of 1,622 (tied with 10 others)
Facility inactive according to reported data. Historical profile: excluded from current aggregates.
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier ROWP_40777_01 · reported size 2,800 h-e design capacity · data year 2022. 984th of 1,622 records with reported size in the inventory of Romania (tied with 10 others); 0.01 % of the sum of those 1,622 records in h-e (sum of records, not national capacity); nearest inventoried plant at 16.6 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | not reported |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | inactive according to reported data |
| Reported coordinates | 46.1170, 25.2690 precision reported by the source: level 1 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Romania
Regulatory framework of Romania · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Nova Hargita Odorheiu Secuiesc | 18.5 km | 41,000 | 30,840 | primary, secondary and tertiary |
| Brasov- St.Zonala Hoghiz | 21.8 km | 16,500 | 4,913 | primary, secondary and tertiary |
| Rowp Primaria Baraolt- Serviciul Public de Alimentare Si Can | 23.4 km | 8,500 | 5,362 | primary and secondary |
| Statie de Epurare Bradesti | 25.4 km | 2,130 | 1,302 | primary and secondary |
| Sucursala Cristuru-Secuiesc | 26.8 km | 13,500 | 8,444 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP ROWP Cata report?
Reported size: 2,800 h-e design capacity. Units are retained without conversion.
What treatment is reported?
Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.