Worldwide wastewater treatment observatory · Switzerland

Aguas SB Observatory · public data to understand water

WWTP Binn

Switzerland · official identifier CH_WWTP_605400

450h-e design capacity (2022) · 631st of 705 (tied with 3 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_605400 · reported size 450 h-e design capacity · received load 268 h-e · reported treatment: PST · data year 2022. 631st of 705 records with reported size in the inventory of Switzerland (tied with 3 others); < 0.01 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.3 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

450h-e design capacity
268h-e received load (2022)
60 %reported load/capacity ratio (not hydraulic utilisation)
631st of 705by reported size among the 705 records with a size in the inventory (tied with 3 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates46.3635, 8.1804 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Switzerland

Regulatory framework of Switzerland. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

22,423reference kWh per year for this load
74.4kWh per h-e (average load) per year
3,363€ per year at 0.15 €/kWh
50 %share of energy used for aeration

what this estimate is · Inputs: 268 p.e. of reported load; equivalent average load 302 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (90 m³/day of reference), not measured or available for reclamation.

LOCATION

Switzerland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Goms5.3 km36,1678,503primary, secondary and tertiary
Simplon-Pass16.8 km50011primary and secondary
Briglina-Brig18.6 km55,00044,445primary, secondary and tertiary
Simplon-Dorf20.9 km450315primary, secondary and tertiary
Regionale Ara-Visp25.6 km388,833196,832primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Binn report?

Reported size: 450 h-e design capacity. Received load: 268 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Binn?

Aguas SB simulator reference scenario for 268 p.e. of reported load: 22,423 kWh per year (74.4 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.