Worldwide wastewater treatment observatory · Switzerland

Aguas SB Observatory · public data to understand water

WWTP NOIRAIGUE

Switzerland · official identifier CH_WWTP_650800

700h-e design capacity (2022) · 584th of 705 (tied with 5 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_650800 · reported size 700 h-e design capacity · received load 424 h-e · reported treatment: PS · data year 2022. 584th of 705 records with reported size in the inventory of Switzerland (tied with 5 others); < 0.01 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.5 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

700h-e design capacity
424h-e received load (2022)
61 %reported load/capacity ratio (not hydraulic utilisation)
584th of 705by reported size among the 705 records with a size in the inventory (tied with 5 others) · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates46.9536, 6.7266 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Switzerland

Regulatory framework of Switzerland. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

31,529reference kWh per year for this load
65.8kWh per h-e (average load) per year
4,729€ per year at 0.15 €/kWh
50 %share of energy used for aeration

what this estimate is · Inputs: 424 p.e. of reported load; equivalent average load 479 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.1estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (143 m³/day of reference), not measured or available for reclamation.

LOCATION

Switzerland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Les Ponts-de-Martel4.5 km2,000979primary and secondary
Travers5.6 km6,6003,592primary and secondary
Provence7.2 km562407primary, secondary and tertiary
Bevaix7.6 km5,0003,603primary and secondary
Mutrux7.6 km287150primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP NOIRAIGUE report?

Reported size: 700 h-e design capacity. Received load: 424 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of NOIRAIGUE?

Aguas SB simulator reference scenario for 424 p.e. of reported load: 31,529 kWh per year (65.8 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.