Worldwide wastewater treatment observatory · Switzerland
Aguas SB Observatory · public data to understand water
WWTP TRAVERS
Switzerland · official identifier CH_WWTP_651000
6,600h-e design capacity (2022) · 332nd of 705 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_651000 · reported size 6,600 h-e design capacity · received load 3,592 h-e · reported treatment: PS · data year 2022. 332nd of 705 records with reported size in the inventory of Switzerland (tied with 1 others); 0.04 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.2 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 46.9333, 6.6587 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Switzerland
Regulatory framework of Switzerland. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 3,592 p.e. of reported load; equivalent average load 4,057 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,211 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Boveresse | 4.2 km | 9,500 | 5,420 | primary and secondary |
| Noiraigue | 5.6 km | 700 | 424 | primary and secondary |
| La Brevine | 6.5 km | 1,000 | 288 | primary and secondary |
| Provence | 7.3 km | 562 | 407 | primary, secondary and tertiary |
| Mutrux | 7.6 km | 287 | 150 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP TRAVERS report?
Reported size: 6,600 h-e design capacity. Received load: 3,592 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of TRAVERS?
Aguas SB simulator reference scenario for 3,592 p.e. of reported load: 199,607 kWh per year (49.2 kWh per p.e. of average load), with aeration as 67 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.