Worldwide wastewater treatment observatory · United Kingdom

Aguas SB Observatory · public data to understand water

WWTP Ballymoney (Glenstall)

United Kingdom · official identifier UKNI_TP00020

40,650h-e design capacity (2018) · 378th of 1,875

European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKNI_TP00020 · reported size 40,650 h-e design capacity · received load 21,153 h-e · reported treatment: PST · data year 2018. 378th of 1,875 records with reported size in the inventory of United Kingdom; 0.04 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.5 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2018

40,650h-e design capacity
21,153h-e received load (2018)
52 %reported load/capacity ratio (not hydraulic utilisation)
378th of 1,875by reported size among the 1,875 records with a size in the inventory · 0.04 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates55.0490, -6.5670 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record

REGULATORY REFERENCES

Referencia normativa: United Kingdom

Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.

LOCATION

United Kingdom: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2018Treatment
Garvagh9.5 km3,2142,773primary and secondary
Kilrea10.3 km3,0002,555primary and secondary
North Coast (Craigtownmore)17.1 km107,40076,036primary and secondary
Bushmills18.2 km8,8625,542primary and secondary
Portglenone19.9 km4,0453,488primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Ballymoney (Glenstall) report?

Reported size: 40,650 h-e design capacity. Received load: 21,153 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.