Worldwide wastewater treatment observatory · United Kingdom

Aguas SB Observatory · public data to understand water

WWTP North Coast (Craigtownmore)

United Kingdom · official identifier UKNI_TP00083

107,400h-e design capacity (2018) · 167th of 1,875

European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKNI_TP00083 · reported size 107,400 h-e design capacity · received load 76,036 h-e · reported treatment: PS · data year 2018. 167th of 1,875 records with reported size in the inventory of United Kingdom; 0.11 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.7 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2018

107,400h-e design capacity
76,036h-e received load (2018)
71 %reported load/capacity ratio (not hydraulic utilisation)
167th of 1,875by reported size among the 1,875 records with a size in the inventory · 0.11 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates55.1900, -6.6760 precision reported by the source: level 0 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record

REGULATORY REFERENCES

Referencia normativa: United Kingdom

Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.

LOCATION

United Kingdom: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2018Treatment
Bushmills9.7 km8,8625,542primary and secondary
Ballymoney (Glenstall)17.1 km40,65021,153primary, secondary and tertiary
Garvagh22.0 km3,2142,773primary and secondary
Limavady22.7 km20,94016,321primary, secondary and tertiary
Ballykelly27.0 km7,8403,651primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP North Coast (Craigtownmore) report?

Reported size: 107,400 h-e design capacity. Received load: 76,036 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.