WWTP DALDOWIE S.T.W.
United Kingdom · official identifier UKSC_TP00049
250,000h-e design capacity (2018) · 60th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKSC_TP00049 · reported size 250,000 h-e design capacity · received load 317,927 h-e · reported treatment: PST · data year 2018. 60th of 1,875 records with reported size in the inventory of United Kingdom; 0.26 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.7 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 55.8338, -4.1219 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 1999 · Advanced treatment was installed at Daldowie Wastewater Treatment Works. Scottish Environment Protection Agency
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Bothwellbank S.T.W. | 4.7 km | 28,000 | 24,937 | primary, secondary and tertiary |
| Allers S.T.W. | 6.0 km | 47,000 | 49,818 | primary, secondary and tertiary |
| Hamilton S.T.W. | 6.1 km | 63,106 | 63,430 | primary, secondary and tertiary |
| Dalmarnock S.T.W. | 6.2 km | 330,000 | 232,840 | primary, secondary and tertiary |
| Philipshill S.T.W. | 9.2 km | 67,590 | 54,258 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP DALDOWIE S.T.W. report?
Reported size: 250,000 h-e design capacity. Received load: 317,927 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.