Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP DALMARNOCK S.T.W.
United Kingdom · official identifier UKSC_TP00050
330,000h-e design capacity (2018) · 46th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKSC_TP00050 · reported size 330,000 h-e design capacity · received load 232,840 h-e · reported treatment: PST · data year 2018. 46th of 1,875 records with reported size in the inventory of United Kingdom; 0.35 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.2 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 55.8350, -4.2209 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 1894 · The Dalmarnock treatment works in Glasgow opened in 1894, according to the city engineer’s memorandum reproduced in 1910. Public health journal and U.S. biomedical archive
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L04; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Daldowie S.T.W. | 6.2 km | 250,000 | 317,927 | primary, secondary and tertiary |
| Philipshill S.T.W. | 6.4 km | 67,590 | 54,258 | primary, secondary and tertiary |
| Allers S.T.W. | 8.1 km | 47,000 | 49,818 | primary, secondary and tertiary |
| Shieldhall S.T.W. | 8.3 km | 574,000 | 563,713 | primary and secondary |
| Eaglesham S.T.W. | 9.7 km | 5,040 | 3,925 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP DALMARNOCK S.T.W. report?
Reported size: 330,000 h-e design capacity. Received load: 232,840 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.