Worldwide wastewater treatment observatory · United Kingdom

Aguas SB Observatory · public data to understand water

WWTP ROTHERHAM STW · UKENNE_YW_TP000054

United Kingdom · official identifier UKENNE_YW_TP000054

114,051h-e design capacity (2018) · 158th of 1,875

European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENNE_YW_TP000054 · reported size 114,051 h-e design capacity · received load 114,051 h-e · reported treatment: PS · data year 2018. 158th of 1,875 records with reported size in the inventory of United Kingdom; 0.12 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.2 km · 12 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2018

114,051h-e design capacity
114,051h-e received load (2018)
100 %reported load/capacity ratio (not hydraulic utilisation)
158th of 1,875by reported size among the 1,875 records with a size in the inventory · 0.12 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates53.4446, -1.3307 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record

REGULATORY REFERENCES

Referencia normativa: United Kingdom

Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.

LOCATION

United Kingdom: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2018Treatment
Swinton Sewage Treatment Works5.2 km18,85618,046primary and secondary
Rotherham Stw · Ukenne_yw_tp0001015.6 km24,09624,096primary and secondary
Sheffield (Blackburn Meadows) Stw5.7 km585,367552,162primary and secondary
Wath On Dearne, Brampton Stw"6.9 km19,49919,499primary and secondary
Denaby Stw7.0 km33,00133,001primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ROTHERHAM STW · UKENNE_YW_TP000054 report?

Reported size: 114,051 h-e design capacity. Received load: 114,051 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.