Worldwide wastewater treatment observatory · United Kingdom
Aguas SB Observatory · public data to understand water
WWTP ROTHERHAM STW · UKENNE_YW_TP000101
United Kingdom · official identifier UKENNE_YW_TP000101
24,096h-e design capacity (2018) · 548th of 1,875
European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKENNE_YW_TP000101 · reported size 24,096 h-e design capacity · received load 24,096 h-e · reported treatment: PS · data year 2018. 548th of 1,875 records with reported size in the inventory of United Kingdom; 0.03 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.2 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2018
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 53.3949, -1.3392 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record |
REGULATORY REFERENCES
Referencia normativa: United Kingdom
Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2018 | Treatment |
|---|---|---|---|---|
| Sheffield (Woodhouse Mill) Stw | 3.2 km | 148,103 | 148,103 | primary and secondary |
| Sheffield (Blackburn Meadows) Stw | 5.2 km | 585,367 | 552,162 | primary and secondary |
| Rotherham Stw · Ukenne_yw_tp000054 | 5.6 km | 114,051 | 114,051 | primary and secondary |
| Dinnington Stw | 8.1 km | 30,000 | 26,394 | primary and secondary |
| Slade Hooton Stw | 8.4 km | 8,000 | 6,325 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP ROTHERHAM STW · UKENNE_YW_TP000101 report?
Reported size: 24,096 h-e design capacity. Received load: 24,096 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.