Worldwide wastewater treatment observatory · Italy

Aguas SB Observatory · public data to understand water

WWTP San_Michele_Al_Tagliamento_Via_Parenzo

Italy · official identifier IT05000000000209

150,000h-e design capacity (2022) · 109th of 3,726 (tied with 5 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier IT05000000000209 · reported size 150,000 h-e design capacity · received load 110,000 h-e · reported treatment: PST · data year 2022. 109th of 3,726 records with reported size in the inventory of Italy (tied with 5 others); 0.14 % of the sum of those 3,726 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.3 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

150,000h-e design capacity
110,000h-e received load (2022)
73 %reported load/capacity ratio (not hydraulic utilisation)
109th of 3,726by reported size among the 3,726 records with a size in the inventory (tied with 5 others) · 0.14 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates45.6420, 13.0750 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2020-08-07 · In 2020, the region found that the permit renewal application for the Bibione wastewater plant was environmentally compatible subject to conditions. Veneto Region

Other published data

Mean annual volume treated reported in the 2022 cycle3,597,732 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Italy

Regulatory framework of Italy · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,114,190reference kWh per year for this load
41.0kWh per h-e (average load) per year
467,128€ per year at 0.15 €/kWh
50 %share of energy used for aeration

what this estimate is · Inputs: 110,000 p.e. of reported load; equivalent average load 75,900 p.e. with the reference profile of Italy (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

8estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (22,000 m³/day of reference), not measured or available for reclamation.

LOCATION

Italy: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Lignano_sabbiadoro_loc_lovato5.3 km86,40082,538primary, secondary and tertiary
San_michele_al_tagliamento_via_aldo_moro14.4 km8,0005,700primary, secondary and tertiary
Latisana_loc_paludo14.7 km14,0009,066primary, secondary and tertiary
Caorle_palangon14.9 km120,00070,052primary, secondary and tertiary
San_giorgio_di_nogaro_z.I._aussa_corno17.9 km698,000105,183primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP San_Michele_Al_Tagliamento_Via_Parenzo report?

Reported size: 150,000 h-e design capacity. Received load: 110,000 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of San_Michele_Al_Tagliamento_Via_Parenzo?

Aguas SB simulator reference scenario for 110,000 p.e. of reported load: 3,114,190 kWh per year (41.0 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.