Worldwide wastewater treatment observatory · Switzerland

Aguas SB Observatory · public data to understand water

WWTP CHANCY

Switzerland · official identifier CH_WWTP_661100

13,600h-e design capacity (2022) · 236th of 705 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_661100 · reported size 13,600 h-e design capacity · received load 8,640 h-e · reported treatment: PS · data year 2022. 236th of 705 records with reported size in the inventory of Switzerland (tied with 1 others); 0.08 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.8 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

13,600h-e design capacity
8,640h-e received load (2022)
64 %reported load/capacity ratio (not hydraulic utilisation)
236th of 705by reported size among the 705 records with a size in the inventory (tied with 1 others) · 0.08 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates46.1454, 5.9658 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Switzerland

Regulatory framework of Switzerland. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

497,233reference kWh per year for this load
51.0kWh per h-e (average load) per year
74,585€ per year at 0.15 €/kWh
41 %share of energy used for aeration

what this estimate is · Inputs: 8,640 p.e. of reported load; equivalent average load 9,755 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1.1estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (2,912 m³/day of reference), not measured or available for reclamation.

LOCATION

Switzerland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Dardagny(Firmenich1)4.8 km47,00028,244primary and secondary
Satigny/Bois-de-Bay8.3 km130,000112,703primary and secondary
Vernier-Ouest(Givaudan)10.9 km97,67675,679primary and secondary
Vernier/Aire11.0 km600,000536,179primary and secondary
Thonex/Villette17.3 km50,00043,551primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP CHANCY report?

Reported size: 13,600 h-e design capacity. Received load: 8,640 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of CHANCY?

Aguas SB simulator reference scenario for 8,640 p.e. of reported load: 497,233 kWh per year (51.0 kWh per p.e. of average load), with aeration as 41 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.