Worldwide wastewater treatment observatory · Switzerland

Aguas SB Observatory · public data to understand water

WWTP VERNIER/AIRE

Switzerland · official identifier CH_WWTP_664301

600,000h-e design capacity (2022) · 2nd of 705

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CH_WWTP_664301 · reported size 600,000 h-e design capacity · received load 536,179 h-e · reported treatment: PS · data year 2022. 2nd of 705 records with reported size in the inventory of Switzerland; 3.6 % of the sum of those 705 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.4 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

600,000h-e design capacity
536,179h-e received load (2022)
89 %reported load/capacity ratio (not hydraulic utilisation)
2nd of 705by reported size among the 705 records with a size in the inventory · 3.6 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates46.1950, 6.0901 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 1967 · Construction of the Aïre wastewater treatment complex in Vernier ended after starting in 1964. Canton of Geneva

Other published data

Mean annual volume treated reported in the 2022 cycle57,185,827 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Switzerland

Regulatory framework of Switzerland. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

18,469,035reference kWh per year for this load
30.5kWh per h-e (average load) per year
2,770,355€ per year at 0.15 €/kWh
58 %share of energy used for aeration

what this estimate is · Inputs: 536,179 p.e. of reported load; equivalent average load 605,318 p.e. with the reference profile of Switzerland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

66estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (180,692 m³/day of reference), not measured or available for reclamation.

LOCATION

Switzerland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Vernier-Ouest(Givaudan)1.4 km97,67675,679primary and secondary
Satigny/Bois-de-Bay3.8 km130,000112,703primary and secondary
Dardagny(Firmenich1)6.6 km47,00028,244primary and secondary
Thonex/Villette7.5 km50,00043,551primary and secondary
Chancy11.0 km13,6008,640primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP VERNIER/AIRE report?

Reported size: 600,000 h-e design capacity. Received load: 536,179 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of VERNIER/AIRE?

Aguas SB simulator reference scenario for 536,179 p.e. of reported load: 18,469,035 kWh per year (30.5 kWh per p.e. of average load), with aeration as 58 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.