Worldwide wastewater treatment observatory · United Kingdom

Aguas SB Observatory · public data to understand water

WWTP Ballycastle

United Kingdom · official identifier UKNI_TP00016

13,563h-e design capacity (2018) · 801st of 1,875

European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · official identifier UKNI_TP00016 · reported size 13,563 h-e design capacity · received load 12,797 h-e · reported treatment: PS · data year 2018. 801st of 1,875 records with reported size in the inventory of United Kingdom; 0.01 % of the sum of those 1,875 records in h-e (sum of records, not national capacity); nearest inventoried plant at 18.4 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2018

13,563h-e design capacity
12,797h-e received load (2018)
94 %reported load/capacity ratio (not hydraulic utilisation)
801st of 1,875by reported size among the 1,875 records with a size in the inventory · 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates55.2020, -6.2380 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · dataset record

REGULATORY REFERENCES

Referencia normativa: United Kingdom

Regulatory framework of United Kingdom. Individual applicability is not determined in this profile.

LOCATION

United Kingdom: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2018Treatment
Bushmills18.4 km8,8625,542primary and secondary
Ballymoney (Glenstall)27.0 km40,65021,153primary, secondary and tertiary
North Coast (Craigtownmore)27.8 km107,40076,036primary and secondary
Kilrea33.6 km3,0002,555primary and secondary
Garvagh36.5 km3,2142,773primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Ballycastle report?

Reported size: 13,563 h-e design capacity. Received load: 12,797 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2019 (v07.01) · data 2018 · edition 2019 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.